|
COVE COLLEGE
OF VOCATIONAL EDUCATION.
This ground breaking college is located on the Team Valley, Gateshead,
Tyne & Wear. We worked for mechanical contractors N.G. Bailey
to install fully air conditioned lecture theatres. This state of
the art VRF system includes self diagnostics and is remotely controlled
via a network. VRF was chosen for ease of installation and it also
avoided the necessity for a large boiler which would have been under-utilised.
EUROBET.
Eurobet is the internet division of Coral. We undertook a major
VRF air conditioning project at the central offices in Woking, Surrey.
This office and comms room upgrade involved relocating the comms
room whilst it continuing to function. By selecting a VRF system,
further modifications, extensions and relocations will be facilitated
at minimal cost.
The very sensitive computer equipment requires heating, cooling
and humidity to be extremely closely controlled. Heat to +/ - ½
degree. Humidity +/- 5%. The monitoring process is very sophisticated,
with text message or e-mail notification of any malfunction.
To protect all of this infrastructure, a state of the art fire
suppression system using inert gas has been installed.
SUPER DRUG STORES PLC.
For new builds we install direct for group parent A.S. Watson
group.
For existing stores we work through facilities managers.
We have recently completed re-fits in the Morpeth, Redcar, Liverpool,
Wakefield, and Hexham stores. In Scotland we have installed air
conditioning for many re-fits including Edinburgh, Broughty Ferry
and Fraserburgh.
Refurbishment air conditioning installations are often undertaken
in trading shops. Here great emphasis is placed on Health &
Safety, with significant out of hours working to minimise disruption.
MEDICAL CENTRES.
There has been a recent drive to fund the development of doctors’
surgeries to enable them to perform more services, including minor
operations. Projects include a mixture of refurbishment, extension
and new build. Requirements typically involve air conditioning system
installation in waiting areas treatment rooms and surgeries. Recent
medical centre projects have been completed in Durham, Scarborough
and Huddersfield.
LEEDS VALLEY OFFICE DEVELOPMENT.
Working here with partners NG Bailey, we have installed a centrally
controlled air conditioning system in 28,000 sq metres of office
space. The project covered two buildings of four storey open plan
office space. The installation includes built in flexibility to
enable the space to be carved into a range of offices of various
sizes.
|